Kororoit Creek Road Level Crossing Removal
With a site accessible only via crossing live train tracks and a huge amount of work to be completed, our Services team pulled out all the stops to deliver for LXRP’s Western Program Alliance.
- works carried out over weekend so as not to interrupt train services
- 56m3 of Topsoil stockpiled locally over the week before the job
- Our blower trucks and slinger trucks both utilised
- 900m2 of hydromulch applied over two days