Spring Farm Parkway

Creating greener futures by transforming roadways into eco-friendly havens, enhancing both environmental sustainability and community wellbeing.

Discover the Spring Farm Parkway Project

Transport NSW, in collaboration with Georgiou, is currently overseeing the construction of a new four-lane, 1km divided road that will connect Menangle Road to the Menangle Park Urban Release Area. This comprehensive project features an interchange with on and off ramps, a shared-use path, and four newly signalised intersections. Georgiou, contracted by Transport for NSW, has engaged ecoDynamics to manage the landscaping for the Spring Farm Parkway.

  • Spring Farm | NSW

    Project scope of work

    • 123,000m2 of ripping batters
    • 161,000m2 of topsoil
    • 160,00m2 hydromulching
    • 12,600+ plants planted
    • 7,300m2 jute mesh
    • 4,300m2 jute mate
    • 7,000m2 mulch
    • 7,500m2 turfing and turf underlay.

Landscaping

Our NSW landscaping team has been entrusted with ensuring the functionality of the roadway while maintaining its environmental sustainability within the surrounding landscape. Our responsibilities include managing water flow and preventing erosion by preparing slopes and drains, and stabilising soil with hydromulch and diverse plant mixes.

We are planting a variety of trees, securing them with stakes and mulch to maintain soil health. To reduce erosion and support new growth, we’re using jute mesh and mats to shield the bare soil from natural elements such as rain and wind that can wash away topsoil. Additionally, we are installing turf to further stabilise the ground.

We’re also enriching center medians and islands with vegetation, enhancing aesthetics, creating habitats, and supporting environmental sustainability.

Maintenance Plan

Upon completion of the landscaping works, we will implement a comprehensive maintenance plan. This plan includes weed control through spraying, regular watering, ensuring plant durability, and replanting if necessary.